Implementation of PI System in Microsoft Azure

Lima, Peru

Kallpa Generación S.A.

Lima, Peru

Kallpa Generación S.A. centralized and standardized operational data across its three power plants — Kallpa, Cerro del Águila, and Puerto Bravo — through a PI System™ architecture deployed on Microsoft Azure™. The solution enabled real-time monitoring, advanced production and environmental calculations, and independent per-plant security management, even in remote locations with limited connectivity.

Managing Operational Data Across Remote, Distributed Plants

Kallpa Generación S.A. operated multiple power generation plants across different geographic locations, each producing critical operational data that needed to be integrated, historized, and analyzed centrally. Key challenges included:

  • Cloud infrastructure: deploying a PI System™ platform on Microsoft Azure™ capable of receiving operational data from plants in different locations.
  • Limited connectivity: integrating remote plants with restricted internet access into the PI System™ ecosystem.
  • Per-plant management: enabling independent administration of security, PI AF, and PI Vision for each operating unit.
  • Centralized historization: consolidating operational data from all plants into a single historical repository.
  • Remote real-time monitoring: supervising and analyzing key operational variables from a distance.
  • Advanced calculations: automating production, maintenance, and environmental indicators.
  • Operational stability: increasing the reliability and continuity of the production process.

A PI System™ Architecture on Microsoft Azure™

A PI System™ architecture was designed and deployed on Microsoft Azure™, tailored to the needs of a geographically distributed, multi-plant operation:

  • Cloud-based PI System™ architecture, sized to meet the connectivity and scalability challenges of the three plants.
  • PI™ interfaces and connectors deployed at each unit to collect data directly from control systems.
  • Plant-specific operational models and advanced calculations, turning raw data into actionable information.
  • PI Data Archive and PI AF configuration with security management based on Active Directory identities and groups, enabling independent administration per plant.
  • Staff training to build self-sufficiency in managing and analyzing their own operational data.

Measurable Operational Impact

  • Successful data centralization across all three plants (Kallpa, Cerro del Águila, and Puerto Bravo) through PI interfaces configured specifically for each.
  • Unified data visualization from a single centralized access point.
  • Reduced manual data-generation work, freeing staff time for analysis instead of data capture.
  • Faster response times, with operational information available online for decision-making.
  • Greater operational process stability, driven by the real-time visibility and monitoring the platform enabled.
  • Guaranteed scalability through Microsoft Azure™ infrastructure, ready for future operational growth.

Why It Matters

  • Better process analysis and decision-making, backed by reliable, up-to-date information.
  • Increased productivity: staff work with information instead of manually generating data.
  • Cross-platform analytical capability, accessible via web and mobile devices.
  • Production indicators and improved supervisory control at each operating unit.
  • Hierarchical organization per plant, aligned to each plant’s specific operational processes.
  • Automated environmental emissions reporting, simplifying regulatory compliance.
  • Advanced calculations and comprehensive KPIs to improve asset performance.
  • Reliable, scalable cloud infrastructure on Microsoft Azure™, ready for future growth.
  • Granular access control for reports and dashboards, by plant.

Projects

We drive innovation with solutions that transform operational efficiency, intelligent monitoring, and real-time management of key processes.

Mining

PIPER View 2026 Upgrade in Compañía Minera Antapaccay

Compañía Minera Antapaccay S.A. completed its upgrade to PIPER View 2026 using an isolated-environment methodology with parallel testing, ensuring a transition with zero critical downtime to its visualization and operational intelligence services. The project delivered new capabilities including a system observability panel, print-standard PDF dashboard export, responsive design, and a query inspector for data auditing — with full backward compatibility and zero rework on existing dashboards.

Espinar, Cusco, Perú

Mining

Implementation of PIPER Operational Intelligence Platform at Séguéla Gold Mine

Implementation of PIPER Operational Intelligence Platform at Fortuna Mining’s Séguéla Gold Mine to automate the collection, contextualization, and reporting of plant, laboratory, and mining data. The solution integrated multiple operational systems through custom APIs, automated daily production reporting, and provided real-time visibility into operational performance through centralized dashboards and analytics.

Solution Implemented

PIPER Operational Platform

  • PIPER Collector
  • PIPER Historian
  • PIPER Modeler
  • PIPER View
  • Operational APIs
  • Interface Monitoring & Notifications

Woroba, Costa de Marfil

Energy

Implementation of PIPER Operational Intelligence Platform at Puerto Bravo Thermal Power Plant

PIPER Solutions implemented the PIPER Operational Intelligence Platform at Samay S.A.C.’s Puerto Bravo Thermal Power Plant to centralize, historize, and contextualize operational data from the GE Mark VIe control system. The project included the integration of more than 4,000 process signals, the development of a standardized operational model, real-time operational dashboards, and Active Directory integration, providing a solid foundation for operational intelligence, process optimization, and future advanced analytics initiatives.

Arequipa, Perú

Mining

Implementation of PIPER Downtimes for Intelligent Downtime Management at Ambatovy

PIPER Downtimes gave a multi-site industrial operation real-time visibility into 40 plants, 120 processes, and nearly 60,000 pieces of equipment — cutting manual event logging to zero and reducing unplanned downtime by 3%.

Antananarivo, Madagascar